Traffic lights at Great Daux and Bell Road and lower speed limits to Kingsfold are proposed for the A24. The consultation runs until 11 January 2027.
Traffic lights would be added to the Great Daux roundabout and the Bell Road junction on the A24 at Horsham under plans now open for comment. Speed limits north of the town would also come down, to 40mph from Warnham to Kingsfold and to 30mph through Kingsfold itself.
West Sussex County Council and Surrey County Council opened the consultation on 18 November (West Sussex County Council). It covers the whole A24 from Worthing to Dorking and closes at 11.55pm on Monday 11 January 2027.
Nothing has been approved or paid for. The councils say there is no detailed cost estimate yet. They expect the work to be funded mostly by developers and government transport grants, which need a business case first (consultation FAQs).
What is proposed around Horsham
The councils’ scheme summary splits the road into five sections. Section D runs from Horsham to Warnham, Kingsfold and Capel. It includes:
- Great Daux roundabout: traffic lights on every approach and on the roundabout itself. The A24 Dorking Road arm would be widened to three entry lanes, the A264 arm to three entry lanes with a separate left-turn lane, and the A24 southern arm to four entry lanes.
- Bell Road junction, Warnham: traffic lights on the Bell Road and A24 Dorking Road approaches, a right-turn lane into Bell Road, and a new puffin crossing over the A24.
- Station Road to Warnham station: a new 1.8m footway in the verge for about 260m from the A24, then a marked walking space on the road up to the station, with low-level lighting.
- Knob Hill, Warnham, to the county boundary: the limit cut from 50mph to 40mph, except through Kingsfold.
- Kingsfold village: the limit cut from 40mph to 30mph.
- Kingsfold footways: a new footway on the west side between The Owl pub and the edge of the village, new crossings near The Owl, the Dog and Duck and the Tylden House bus stop, and a possible bus shelter by The Owl.
- Great Daux to Clark’s Green, Capel: a review of anti-skid surfacing, signs and edge markings.
Drawings for Great Daux are on the consultation page (Great Daux route map).
The councils looked at building a new stretch of road between Great Daux and Clark’s Green and rejected it. They say it would encourage more traffic and that the cost and environmental harm made it undeliverable. Kingsfold gets crossings without lights, because the councils’ surveys found too few people crossing to justify signals (consultation FAQs).
South of Horsham
Section C runs from Dial Post to Southwater. It includes:
- the limit cut from 70mph to 60mph in both directions at Dial Post
- more central safety barrier between Dial Post and the Buck Barn area
- the limit cut from 70mph to 60mph northbound only, from Buck Barn to the Bar Lane junction
There are no firm plans for two Southwater-area junctions. At Hop Oast, where the A24 meets the B2237, the county is in talks with Horsham District Council and the developer of the Land North West of Southwater site about lights, signal crossings and bus priority. At Buck Barn, where the A24 meets the A272, the councils are waiting to see whether the Wealdcross site is included in the Local Plan.
Further south, Washington roundabout, about 11 miles south of Horsham, would get traffic lights and toucan crossings.
Have your say
The survey and maps are at yourvoice.westsussex.gov.uk/a24-worthing-horsham-dorking. The survey takes five to ten minutes, the councils say.
The nearest drop-in event to Horsham is:
- Wednesday 2 December, 3.30pm to 6.30pm: St Margaret’s Church, Church Street, Warnham RH12 3QW
The others are at Findon Village Hall (30 November), Washington Village Memorial Hall (7 December), Capel Parish Hall (8 December) and North Holmwood Village Hall (15 December).
For an alternative format, email LTP@westsussex.gov.uk or call 01243 642105.
What it means for you
If you drive the A24 north towards Dorking, the Great Daux and Bell Road changes are the ones that would most change your journey. If you walk or cycle to Warnham station, the new footway on Station Road is aimed at you.
Do not expect cones soon. The councils say any further design, consultation, planning and funding would come first, and that larger measures are likely to be several years from construction. A consultation report will follow once responses are analysed.
Cllr Erika Woodhurst-Trueman, West Sussex County Council’s Cabinet Member for Highways and Transport, said the councils want to know “if our updated proposals reflect your comments and address concerns you shared with us about congestion and road safety”. A first round of engagement ran in autumn 2025.
Have your say